Road construction in Nigeria drives economic growth but faces risks such as delays and substandard quality, requiring context-specific risk management. This study assesses risk management practices in urban road projects within the Federal Capital Territory (FCT) under the Federal Roads Maintenance Agency (FERMA). Key risks were identified, their impacts analyzed, and mitigation strategies proposed. Using a survey of project managers, engineers, and contractors, data was analyzed via the Relative Importance Index (RII), highlighting price fluctuations and market uncertainties as the top risks, alongside critical technical, financial, and legal issues. Pearson’s correlation revealed that poor soil recognition and misaligned construction choices were the most significant technical risks, while inadequate cost planning and failure to control costs were major financial risks. The findings emphasize early risk identification and targeted mitigation to enhance project efficiency, reduce delays, and limit cost overruns. This study advances understanding of construction risk management in Nigeria, offering actionable insights for FERMA and other stakeholders to improve decision-making and project delivery.
| Published in | American Journal of Engineering and Technology Management (Volume 11, Issue 6) |
| DOI | 10.11648/j.ajetm.20261106.11 |
| Page(s) | 106-116 |
| Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
| Copyright |
Copyright © The Author(s), 2026. Published by Science Publishing Group |
Risk Identification, Risk Assessment, Risk Handling Actions, Road Construction Projects, Risk Management
(%) | Rank | Mean | |
|---|---|---|---|
Technical Risks | |||
Improper design and preparation of Bills | 14.71 | 24 | 2.68 |
Improper selection of the types of construction | 26.47 | 20 | 2.76 |
Equipment failure/breakdown | 76.47 | 8 | 3.46 |
Badly recognized soil structure | 52.94 | 14 | 3.21 |
Delay in project due to unforeseen site conditions | 64.71 | 11 | 2.74 |
Delay in mobilization | 88.24 | 2 | 3.93 |
Construction materials quality | 82.35 | 5 | 3.73 |
Inefficient planning | 76.47 | 8 | 3.42 |
Financial Risks | |||
Underestimating the costs of the project | 64.71 | 11 | 2.79 |
Overestimating the costs of the project | 32.35 | 18 | 3.09 |
Delay of material supply by suppliers | 79.41 | 6 | 3.65 |
Failure to maintain project progress within the estimated cost | 79.41 | 6 | 3.70 |
Improper cost plan | 26.47 | 20 | 3.12 |
Environmental Risks | |||
Price fluctuation and market uncertainty related to materials and labors | 97.06 | 1 | 4.21 |
Social Risk | |||
Lack of leadership quality of project manager, Engineer or contractor | 23.53 | 22 | 3.06 |
Insufficient control of site workers (insufficient engineers at the site) | 44.12 | 15 | 3.09 |
Poor work organization and extending the scope of work | 85.29 | 4 | 3.90 |
Accidents on site resulting in physical injury | 29.41 | 19 | 3.03 |
Employees’ absence (illness, strike, etc.) | 41.18 | 16 | 2.91 |
Legal Risks | |||
Conflicts in contract documents | 35.29 | 17 | 3.24 |
Criminal Acts/ Theft | 61.76 | 13 | 3.02 |
Lack of effective monitoring and feedback by project manager | 20.59 | 23 | 3.15 |
Inadequate/unclear definition of project scope | 14.71 | 24 | 2.88 |
Failure in completing the project as planned and within estimated time | 85.29 | 2 | 3.94 |
Poor management of personnel, supplies and material resources | 73.53 | 10 | 3.41 |
Badly recognized soil structure | Delay in mobilization | Inefficient planning | |
|---|---|---|---|
Improper design and preparation of Bills | 0.142 | 0.265 | .493** (0.003) |
Improper selection of the types of construction | .690** (0.000) | -0.075 | 0.163 |
Delay in mobilization | -0.235 | 1 | .551** (0.000) |
Inefficient planning | -0.001 | .551** (0.001) | 1 |
Overestimating the costs of the project | Underestimating the costs of the project | Delay of material supply by suppliers | Failure to maintain project progress within the estimated cost | |
|---|---|---|---|---|
Overestimating the costs of the project | 1 | 0.172 | 0.257 | 0.204 |
Underestimating the costs of the project | 0.172 | 1 | 0.253 | 0.218 |
Delay of material supply by suppliers | 0.257 | 0.253 | 1 | 0.13 |
Failure to maintain project progress within the estimated cost | 0.204 | 0.218 | 0.13 | 1 |
Improper cost plan | 0.021 | 0.28 | 0.128 | .441**(0.009) |
Conflicts in contract document | Criminal Acts/ Theft | Lack of effective monitoring and feedback by project manager | Failure in completing the project as per design planned and within estimated time duration | |
|---|---|---|---|---|
Conflicts in contract document | 1 | .542** (0.001) | .495** (0.003) | 0.215 |
Criminal Acts/ Theft | .542** (0.001) | 1 | 0.193 | .448** (0.008) |
Lack of effective monitoring and feedback by project manager | .495** (0.003) | 0.193 | 1 | -0.005 |
Failure in completing the project as per design planned and within estimated time duration | 0.215 | .448** (0.008) | -0.005 | 1 |
Lack of leadership quality of project manager, Engineer or contractor | Insufficient control of site workers (insufficient engineers at the site) | Extending the scope of work and poor work organization | Accidents on site resulting in physical injury | Employees’ absence (illness, strike, etc.) | |
|---|---|---|---|---|---|
Lack of leadership quality of project manager, Engineer or contractor | 1 | 0.056 | 0.199 | -0.021 | -0.039 |
Insufficient control of site workers (insufficient engineers at the site) | 0.056 | 1 | 0.326 | 0.274 | 0.135 |
Extending the scope of work and poor work organization | 0.199 | 0.326 | 1 | 0.148 | -0.14 |
Accidents on site resulting in physical injury | -0.021 | 0.274 | 0.148 | 1 | .409* (0.016) |
Employees’ absence (illness, strike, etc.) | -0.039 | 0.135 | -0.14 | .409* (0.016) | 1 |
s/n | Risk | Risk Handling Action |
|---|---|---|
1 | Price fluctuation and market uncertainty related to materials and labors | Contractual Adjustments: Use cost escalation clauses in contracts to account for price changes Market Analysis & Supplier Agreements: Monitor market trends and secure long-term contracts with suppliers to stabilize prices Hedging & Alternative Sourcing: Utilize commodity futures and maintain a list of alternative suppliers for flexibility Contingency Budget: Allocate reserves for unforeseen cost increases Collaborative Partnerships & Insurance: Build partnerships with suppliers and secure insurance to mitigate financial risks |
2 | Failure in completing the project as planned and within estimated time | Comprehensive Planning & Stakeholder Engagement: Conduct detailed planning, engage stakeholders, and review designs to prevent flaws Quality Assurance & Monitoring: Apply QA/QC measures and use real-time tracking to detect and address deviations Change Management & Contingency Planning: Establish change tracking systems and allocate time buffers for unplanned issues Design-Build Approach & Audits: Adopt a design-build method and conduct regular inspections to ensure timely completion [22] |
3 | Delay in mobilization | Mobilization Planning & Site Assessment: Develop mobilization plans with site-specific considerations and assess site conditions early Supplier Engagement & Contractual Clarity: Engage suppliers early and set clear mobilization timelines in contracts with penalties for delays. Resource Allocation & Contingency Plans: Allocate sufficient resources and prepare contingency plans for alternative suppliers and equipment. Monitoring & Weather Flexibility: Track mobilization progress using KPIs and account for weather-related risks in project schedules [19] |
4 | Poor work organization and extending the scope of work | Scope Definition & Change Management: Clearly define scope and establish formal change control procedures Communication & Documentation: Ensure stakeholders are informed of changes, with all agreements documented Contract Clarity & Dispute Resolution: Include scope-change provisions and dispute resolution mechanisms in contracts. Risk Assessment & Workforce Management: Identify risks linked to scope changes, allocate skilled labor, and use efficient resource allocation methods Monitoring & Periodic Reviews: Track project progress and conduct reviews to maintain alignment with project objectives [20] |
5 | Construction materials quality | Supplier Selection & Quality Testing: Use reputable suppliers and conduct pre-construction testing to ensure material quality QA/QC Plans & Audits: Implement quality assurance/control plans and conduct regular audits Material Handling & Storage: Ensure proper storage to prevent damage, and maintain documentation of test results and compliance records |
6 | Failure to maintain project progress within the estimated cost | Detailed Cost Estimation & Tracking: Conduct comprehensive project planning and track expenses against budgets Contingency Reserves & Value Engineering: Set aside contingency funds and apply value engineering to minimize costs Supplier & Contractor Management: Build strong supplier/contractor relationships to reduce delays and cost increases. [22] KPI Tracking & Regular Reviews: Measure cost efficiency using KPIs and review project progress regularly to identify issues |
7 | Delay of material supply by suppliers | Supplier Assessment & Contracts: Assess supplier reliability and include strict delivery schedules with penalty clauses in contracts Supply Chain Management & Alternative Suppliers: Maintain supply chain visibility and pre-qualify alternative suppliers Communication & Performance Monitoring: Maintain open communication with suppliers and track performance against timelines Risk Mitigation & Legal Remedies: Use contingency funds to absorb delays and pursue legal action for repeated supplier failures [31] |
8 | Equipment failure/breakdown | Proactive Maintenance & Inspection: Conduct scheduled maintenance and inspections to detect and prevent failures Spare Parts & Backup Equipment: Stock spare parts and secure supplier agreements for quick replacements Equipment Monitoring & Telematics: Use telematics for real-time equipment tracking and performance monitoring Operator Training & Certification: Train operators to improve equipment handling and prevent misuse Contingency Planning & Equipment Insurance: Develop response plans for equipment breakdowns and obtain equipment breakdown insurance [25] |
9 | Inefficient planning | Comprehensive Planning & WBS: Develop a work breakdown structure (WBS), schedules, and resource plans for efficient execution Risk Assessment & Stakeholder Engagement: Identify risks early and engage stakeholders to align goals and execution plans Lean Construction & Change Management: Apply lean construction to minimize waste and establish a formal change management process Monitoring & Reporting: Track progress regularly using KPIs to detect issues early and apply corrective actions [18] |
10 | Poor management of personnel, supplies and material resources | Resource Planning & Supplier Management: Plan for material needs, supply chains, and personnel allocation; build strong supplier relationships for timely deliveries Inventory Control & Technology Adoption: Use inventory control systems to reduce overstocking and adopt construction technologies for better resource utilization [21] Training & Development: Train workers and project teams to enhance productivity and reduce inefficiencies QA/QC & Risk Management: Implement quality assurance/control procedures and establish a risk management framework for resource-related risks Performance Tracking & Continuous Improvement: Use KPIs to track resource utilization and review project progress for continuous improvement [32] |
FERMA | Federal Roads Maintenance Agency |
FCT | Federal Capital Territory |
RM | Risk Management |
RII | Relative Importance Index |
Pcc. | Pearson Correlation Coefficient |
SPSS | Statistical Package for the Social Sciences |
QA | Quality Assurance |
QC | Quality Control |
QA/QC | Quality Assurance and Quality Control |
KPI | Key Performance Indicator |
RBS | Risk Breakdown Structure |
WBS | Work Breakdown Structure |
NBS | Nigerian Bureau of Statistics |
P-value | Probability Value (Statistical Significance Level) |
| [1] | Agarwal, P. K., Khan, A. B., & Choudhary, S. (2017). A rational strategy for resource allocation for rural road maintenance. Transportation Research Procedia, 25, 2200-2212. |
| [2] | Brookes, N. (2013). Risk Management in Construction Projects: A Critical Review. Construction Management and Economics, 31(6), 547-559. |
| [3] | Brookes, N. (2023). Construction project management. Construction Management and Economics, 31(9). |
| [4] | C. (1997). <00B7D52C1D327Ab490000000.Pdf>. International Journal of Project Management, 15(1), 31-38. |
| [5] | Chapman, C., & Ward, S. (2011). Project Risk Management: Processes, Techniques, and Insights (2nd ed.). Wiley. |
| [6] | Creswell, J. W. (2014). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches (4th ed.). SAGE Publications. |
| [7] | Doh, S. I., Khoiry, M. A., Kassem, M. A., & Al-Sharafi, M. A. (2022). The Current Risk Management Practices and Knowledge in the Construction Industry. Buildings, 12(7), 1016. |
| [8] | Fenton, E. R., Bhatti, A. A., & Hadi, A. M. (2018). Using Relative Importance Index (RII) for Evaluating Risk Factors in Construction Projects. Journal of Construction Engineering and Management, 144(4), 04018014. |
| [9] | GAİN, H. (2021). Impact of risk management practice on success of road construction project. Social Mentality and Researcher Thinkers Journal, 7(54), 3467-3475. |
| [10] | Gain, H., Bhandari, M., Academy, M., Aithal, S., & Mishra, A. K. (2022). Risk management practice adopted in road construction project. International Journal of Management, Technology, and Social Sciences, 20-36. |
| [11] | Gain, H., Mishra, A. K., & Aithal, P. S. (2022). Risk management practice adopted in road construction project. International Journal of Management, Technology, and Social Sciences, 21-36. |
| [12] | Gain, K., Pappas, L., & Lee, C. (2021). Risk Classification and Management in Construction Projects. International Journal of Project Management, 39(3), 286-297. |
| [13] | Gain, K., Pappas, L., & Lee, C. (2022). Risk Allocation in Large Infrastructure Projects. International Journal of Construction Management, 25(3), 169-181. |
| [14] | Hillson, D. (2017). Managing Risk in Projects (3rd ed.). Routledge. |
| [15] | Iyer, K. C., & Jha, K. N. (2005). Risk Management in Construction Projects: A Study of Indian Construction Industry. International Journal of Project Management, 23(3), 263-270. |
| [16] | J. Uff, A. O. (1995). Risk, management and procurement in construction. |
| [17] | Kartam, N. A., & Kartam, S. A. (2021). Risk and its management in the Kuwaiti construction industry: A contractors’ perspective. International Journal of Project Management, 19(6), 325-335. |
| [18] | Kartam, N., & Kartam, J. (2021). Multi-Criteria Risk Assessment for Road Construction Projects. Construction Risk Management Journal, 38(2), 104-118. |
| [19] | Li, H., & Zou, P. X. (2019). Risk Management in the Construction Industry: A Review. Construction Management and Economics, 37(2), 100-120. |
| [20] | Li, H., Zhang, C., & Xie, F. (2018). Risk Management for Road Construction Projects in Developing Countries. Journal of Construction Engineering and Management, 144(8), 04018065. |
| [21] | Miller, R., & Lessard, D. (2021). Understanding and managing risks in large engineering projects. International Journal of Project Management, 19(8), 437-443. |
| [22] | Nael G. Bunni. (n.d.). The FIDIC Forms of Contract, 3, 872. |
| [23] | Nguyen, T., Le, H., & Tran, D. (2021). Risk Management in Transportation Projects in Developing Countries. Journal of Construction Engineering and Management, 147(5), 04021033. |
| [24] | Nigerian Bureau of Statistics. (2019). Nigeria’s Infrastructure Deficit and the Need for Investment. Abuja: National Planning Commission. |
| [25] | Oni, O. Z., Amusan, L. M., Owolabi, J. D., & Akinbile, B. F. (2019). Factors affecting quality management practices on building construction sites in Nigeria. Journal of Physics: Conference Series, 1299(1). |
| [26] | Osei-Kyei, R., Narbaev, T., & Ampratwum, G. (2022). A Scientometric Analysis of Studies on Risk Management in Construction Projects. Buildings, 12(9), 1342. |
| [27] | Pallant, J. (2016). SPSS Survival Manual: A Step-by-Step Guide to Data Analysis Using IBM SPSS (6th ed.). McGraw-Hill Education. |
| [28] | Perera, B. A. K. S., Dhanasinghe, I., & Rameezdeen, R. (2019). Risk management in road construction: The case of Sri Lanka. International Journal of Strategic Property Management, 13(2), 87-102. |
| [29] | Zwikael, O., & Ahn, M. (2011). The Effectiveness of Risk Management on Project Performance: A Meta-Analysis. International Journal of Project Management, 29(6), 646-657. |
| [30] | Perera, S., Gunasekera, S., & Hewage, K. (2019). Risk Management in Sri Lankan Road Projects. Journal of Construction Engineering and Management, 145(9), 04019062. |
| [31] | Roger, F., & George, N. (2013). Risk Management and Construction by Roger Flanagan, George Norman. In Royal Institution of Chartered Surveyors. |
| [32] | Serpella, A. F., Ferrada, X., Howard, R., & Rubio, L. (2014). Risk management in construction projects: A knowledge-based approach. Procedia - Social and Behavioral Sciences, 119, 653-662. |
| [33] | Smith, N. J., Merna, T., & Jobling, P. (2009). Managing Risk in Construction Projects (2nd ed.). Wiley-Blackwell. |
| [34] | Szymański, P. (2017). Risk management in construction projects. Procedia Engineering, 208(January 2017), 174-182. |
| [35] | T. H. Nguyen, G. Bhagavatulya, F. J. (2011). Risk assessment: A case study for transportation projects in India. |
| [36] | Tavakol, M., & Dennick, R. (2011). Making Sense of Cronbach’s Alpha. International Journal of Medical Education, 2, 53-55. |
| [37] | Ugwu, M. C., Osunsanmi, T. O., & Aigbavboa, C. O. (2019). Evaluation of risk management practice in the Nigerian construction industry. Modular and Offsite Construction (MOC) Summit Proceedings, July, 373-380. |
| [38] | Uher, T. E., & Toakley, A. R. (2019). Risk management in the conceptual phase of a project. International Journal of Project Management, 17(3), 161-169. |
| [39] | Wang, M.-T., & Chou, H.-Y. (2023). Risk allocation and risk handling of highway projects in Taiwan. Journal of Management in Engineering, 19(2), 60-68. |
| [40] | Wang, Q., & Chou, J. (2020). Risk Management Methods in Construction Projects: A Comparative Study. Journal of Construction Project Management, 36(4), 89-102. |
| [41] | Wiguna, I. P. A., & Scott, S. (2016). Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), 1125-1135. |
| [42] | Williams, C., O’Brien, C., & Green, R. (2020). Application of Pearson's Correlation Coefficient in Construction Risk Analysis. Construction Management and Economics, 38(3), 261-273. |
| [43] | Zhang, L., Chen, Z., & Li, J. (2023). A Study of Risk Factors in Large Construction Projects: Case Study of Road Infrastructure Projects in China. Journal of Construction Engineering and Management, 149(2), 04022124. |
APA Style
Usman, J. H., Alabi, A. A. (2026). Evaluation of Risk Management in Road Construction Projects in Nigeria: A Case Study of FERMA Projects in the Federal Capital Territory (FCT), Nigeria. American Journal of Engineering and Technology Management, 11(6), 106-116. https://doi.org/10.11648/j.ajetm.20261106.11
ACS Style
Usman, J. H.; Alabi, A. A. Evaluation of Risk Management in Road Construction Projects in Nigeria: A Case Study of FERMA Projects in the Federal Capital Territory (FCT), Nigeria. Am. J. Eng. Technol. Manag. 2026, 11(6), 106-116. doi: 10.11648/j.ajetm.20261106.11
@article{10.11648/j.ajetm.20261106.11,
author = {Joy Hafsat Usman and Abdulmumin Akoredeley Alabi},
title = {Evaluation of Risk Management in Road Construction Projects in Nigeria: A Case Study of FERMA Projects in the Federal Capital Territory (FCT), Nigeria},
journal = {American Journal of Engineering and Technology Management},
volume = {11},
number = {6},
pages = {106-116},
doi = {10.11648/j.ajetm.20261106.11},
url = {https://doi.org/10.11648/j.ajetm.20261106.11},
eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajetm.20261106.11},
abstract = {Road construction in Nigeria drives economic growth but faces risks such as delays and substandard quality, requiring context-specific risk management. This study assesses risk management practices in urban road projects within the Federal Capital Territory (FCT) under the Federal Roads Maintenance Agency (FERMA). Key risks were identified, their impacts analyzed, and mitigation strategies proposed. Using a survey of project managers, engineers, and contractors, data was analyzed via the Relative Importance Index (RII), highlighting price fluctuations and market uncertainties as the top risks, alongside critical technical, financial, and legal issues. Pearson’s correlation revealed that poor soil recognition and misaligned construction choices were the most significant technical risks, while inadequate cost planning and failure to control costs were major financial risks. The findings emphasize early risk identification and targeted mitigation to enhance project efficiency, reduce delays, and limit cost overruns. This study advances understanding of construction risk management in Nigeria, offering actionable insights for FERMA and other stakeholders to improve decision-making and project delivery.},
year = {2026}
}
TY - JOUR T1 - Evaluation of Risk Management in Road Construction Projects in Nigeria: A Case Study of FERMA Projects in the Federal Capital Territory (FCT), Nigeria AU - Joy Hafsat Usman AU - Abdulmumin Akoredeley Alabi Y1 - 2026/11/16 PY - 2026 N1 - https://doi.org/10.11648/j.ajetm.20261106.11 DO - 10.11648/j.ajetm.20261106.11 T2 - American Journal of Engineering and Technology Management JF - American Journal of Engineering and Technology Management JO - American Journal of Engineering and Technology Management SP - 106 EP - 116 PB - Science Publishing Group SN - 2575-1441 UR - https://doi.org/10.11648/j.ajetm.20261106.11 AB - Road construction in Nigeria drives economic growth but faces risks such as delays and substandard quality, requiring context-specific risk management. This study assesses risk management practices in urban road projects within the Federal Capital Territory (FCT) under the Federal Roads Maintenance Agency (FERMA). Key risks were identified, their impacts analyzed, and mitigation strategies proposed. Using a survey of project managers, engineers, and contractors, data was analyzed via the Relative Importance Index (RII), highlighting price fluctuations and market uncertainties as the top risks, alongside critical technical, financial, and legal issues. Pearson’s correlation revealed that poor soil recognition and misaligned construction choices were the most significant technical risks, while inadequate cost planning and failure to control costs were major financial risks. The findings emphasize early risk identification and targeted mitigation to enhance project efficiency, reduce delays, and limit cost overruns. This study advances understanding of construction risk management in Nigeria, offering actionable insights for FERMA and other stakeholders to improve decision-making and project delivery. VL - 11 IS - 6 ER -